Por favor, use este identificador para citar o enlazar este ítem: http://bibdigital.epn.edu.ec/handle/15000/11839
Registro completo de metadatos
Campo DCValorLengua/Idioma
dc.contributor.authorConstante Vaca, Jorge Vinicio-
dc.contributor.authorMoreira Zambrano, Karla Julieth-
dc.date.accessioned2015-10-19T16:52:34Z-
dc.date.available2015-10-19T16:52:34Z-
dc.date.issued2015-10-16-
dc.identifier.citationConstante Vaca, J. V., & Moreira Zambrano, K. J. (2015). Estudio técnico económico de los tiempos no productivos (NPT) incurridos en las operaciones de perforaciòn del campo palo azul en el período 2012-2014. 169 hojas. Quito : EPN.es_ES
dc.identifier.otherT-GMP/0618/CD 6546-
dc.identifier.urihttp://bibdigital.epn.edu.ec/handle/15000/11839-
dc.descriptionEste proyecto pretende analizar las razones técnicas y operativas de los tiempos no productivos ocasionados en el Campo Palo Azul a partir del año 2012; además de proponer prácticas alternativas para lograr optimizar la generación de los tiempos no productivos en las operaciones de perforación. Para ello, son ocho pozos los analizados con los reportes de perforación emitidos por parte de la Empresa Operadora, con la finalidad de obtener datos técnicos y estadísticos de los resultados que durante las operaciones de perforación se han dado y poder obtener desenlaces que permitan en un futuro que los tiempos no productivos no afecten a dicha actividad. En base al estudio realizado se estableció propuestas de prácticas alternativas para mejorar pérdidas de tiempos y costos en las operaciones de perforación.es_ES
dc.description.abstractThis project aims to analyze the technical and operational non-productive time incurred in Palo Azul field from the year 2012; and proposing alternative practices in order to optimize the generation of non-productive times in drilling operations. To do this, they are eight wells analyzed with each drilling reports issued by the operating company in order to obtain technical and statistical data on the results during drilling operations have occurred and obtain outcomes that allow wells on a future non-productive time do not affect the activity. Based on the study proposals for alternative practices it was established to improve time and cost loss in drilling operations.es_ES
dc.description.sponsorshipBarrera Pijal, Einstein Wagner, directores_ES
dc.language.isospaes_ES
dc.publisherQuito, 2015.es_ES
dc.rightsopenAccess-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/-
dc.subjectYacimientos de petróleoes_ES
dc.subjectPerforación de pozoses_ES
dc.titleEstudio técnico económico de los tiempos no productivos (NPT) incurridos en las operaciones de perforación del campo palo azul en el período 2012-2014es_ES
dc.typebachelorThesises_ES
Aparece en las colecciones:Tesis Ingeniería en Petróleos (IPET)

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
CD-6546.pdf4,55 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.