Por favor, use este identificador para citar o enlazar este ítem: http://bibdigital.epn.edu.ec/handle/15000/11900
Registro completo de metadatos
Campo DCValorLengua/Idioma
dc.contributor.authorGarcía Cedeño, Edison Fernando-
dc.date.accessioned2015-11-09T16:51:19Z-
dc.date.available2015-11-09T16:51:19Z-
dc.date.issued2015-10-22-
dc.identifier.citationGarcía Cedeño, E. F. (2015). Diseño e instalación de un nodo B adicional en una zona de alto tráfico de la ciudad de El Coca provincia de Orellana para aumentar capacidad y cobertura de la red UMTS. 184 hojas. Quito : EPN.es_ES
dc.identifier.otherT-IE/4174/CD 6577-
dc.identifier.urihttp://bibdigital.epn.edu.ec/handle/15000/11900-
dc.descriptionEste proyecto presenta el proceso y desarrollo de la implementación de un nuevo nodo B en una zona que es estratégicamente escogida en la población El Coca, el mismo que servirá como soporte de tráfico a celdas aledañas e incremento de área de cobertura de la red UMTS dentro de la población mencionada, y que beneficiará aproximadamente a 400 abonados cercanos a la zona centro-norte. El proyecto comprende tres etapas: La etapa de la evidencia del problema, etapa del planeación o diseño y la etapa de instalación y pruebas, las mismas que certifican el objetivo de soporte de tráfico e incremento de cobertura. Dentro de la etapa de evidencia del problema se realiza un análisis de zonas deficientes de cobertura con pruebas de drive test y reportes estadísticos, en la etapa de planeación se realiza el diseño y simulaciones del nuevo nodo B para pre-visualizar su comportamiento con los nodos aledaños y por último la etapa de instalación y pruebas donde se presenta el análisis de resultados después de la instalación además de presentar la comparación de las mejoras de un estado antes y de un estado después de la implementación.es_ES
dc.description.abstractThis project presents the process and development of the implementation of a new node B in an area that is strategically chosen in the country El Coca, the same that will serve as support traffic to nearby cells and increased coverage area of the UMTS network in of the country mentioned, and benefits approximately 400 subscribers near the north-central area. The project has three stages: evidence of the problem stage, planning or design stage and installation and testing stage, certifying them in order to support traffic and increased coverage. Within evidence of the problem stage analysis poor coverage areas with test drive test and statistical reports, in the planning stage design and does simulations of the new node B is performed to preview behavior with storage nearby nodes and finally installation and testing stage where analysis results and show a comparison before state and after state implementation.es_ES
dc.description.sponsorshipLupera Morillo, Pablo Aníbal, directores_ES
dc.language.isospaes_ES
dc.publisherQuito, 2015.es_ES
dc.rightsopenAccess-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/-
dc.subjectComunicaciones inalámbricases_ES
dc.subjectTeoría electromagnéticaes_ES
dc.titleDiseño e instalación de un nodo B adicional en una zona de alto tráfico de la ciudad de El Coca provincia de Orellana para aumentar capacidad y cobertura de la red UMTSes_ES
dc.typebachelorThesises_ES
Aparece en las colecciones:Tesis Electrónica y Telecomunicaciones (IET)

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
CD-6577.pdf23,77 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.