Por favor, use este identificador para citar o enlazar este ítem: http://bibdigital.epn.edu.ec/handle/15000/16672
Registro completo de metadatos
Campo DCValorLengua/Idioma
dc.contributor.authorAguirre Romo, Julián Leonardo-
dc.contributor.authorMayorga Mora, Valeria Alejandra-
dc.date.accessioned2016-09-05T22:10:49Z-
dc.date.available2016-09-05T22:10:49Z-
dc.date.issued2016-09-02-
dc.identifier.citationAguirre Romo, J. L. & Mayorga Mora, V. A. (2016). Diseño y desarrollo de un sistema gerencial de obras, aplicado al control de costos en la construcción. 125 hojas. Quito : EPN.es_ES
dc.identifier.otherT-IC/0723/CD 7275-
dc.identifier.urihttp://bibdigital.epn.edu.ec/handle/15000/16672-
dc.descriptionEl presente proyecto propone el desarrollo de un software para el sistema operativo de Windows, que se lo nombró SCC (Sistema de Control de Costos) para incrementar la productividad en pequeñas y medianas empresas constructoras, aplicando la filosofía Lean y utilizando una arquitectura cliente-servidor, con Visual Basic.net /MySQL como lenguaje de programación. El objetivo del SCC es optimizar el control de costos en la construcción agilitando el flujo de datos entre la obra y la oficina de la empresa constructora y optimizando el flujo de actividades administrativas. Para ello, se aplicará los principios Lean en un diagrama genérico de control de costos y cantidades que representa la realidad de las empresas. Seguidamente, se realizó una verificación del programa en la obra ya construida de “Jardines de Ninallacta” introduciendo información de dos meses para la obtención de resultados como: planillas de contratistas, comparación de presupuesto vs realmente ejecutado, cronograma vs ejecutado y gráficos semanales de costos parciales y acumulados de mano de obra, materiales, herramientas y equipo, y costo total. Finalmente, se confirma la mejora que el programa SCC brinda a las empresas comparado con la metodología rudimentaria utilizada originalmente en el proyecto.es_ES
dc.description.abstractThis present project comes up with the development of a software, to increase productivity in small and medium construction companies, applying the Lean philosophy and using a client-server architecture, using Visual Basic.net / MySQL as programming language. The software development was made in order to optimize the flow chart of businesses, to do so, it started with a generic diagram of cost and quantity control commonly used by Ecuadorian companies. Once the diagram is obtained it proceeded with the Lean Principles guidelines to identify activities that do not generate value to the customer and replace them with automated processes obtaining greater availability of time devoted to work. Next, the SCC program is tested on the already built project of "Jardines de Ninallacta" entering a two month data stream to obtain reports such as: contractors’ payroll, comparison between estimates and actual spent money, scheduled compared with actual finish time, and partial and accumulated labor, material, tool and equipment, and total cost weekly or monthly charts. Finally, the present work proofs the versatility of the SCC compared with the rudimentary methodology used in the actual “Jardines de Ninallacta” construction project.es_ES
dc.description.sponsorshipPinto Gaibor, Pablo Alejandro, directores_ES
dc.language.isospaes_ES
dc.publisherQuito, 2016.es_ES
dc.rightsopenAccess-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/-
dc.subjectEstructuras (Construcción)es_ES
dc.subjectProgramaciónes_ES
dc.titleDiseño y desarrollo de un sistema gerencial de obras, aplicado al control de costos en la construcción.es_ES
dc.typebachelorThesises_ES
Aparece en las colecciones:Tesis Ingenieria Civil y Ambiental (ICA)

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
CD-7275.pdf18,35 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.