Por favor, use este identificador para citar o enlazar este ítem: http://bibdigital.epn.edu.ec/handle/15000/17017
Registro completo de metadatos
Campo DCValorLengua/Idioma
dc.contributor.authorMafla Tutillo, Horacio Eduardo-
dc.date.accessioned2017-01-24T20:38:22Z-
dc.date.available2017-01-24T20:38:22Z-
dc.date.issued2017-01-11-
dc.identifier.citationMafla Tutillo, H. E. (2017). Estudio de Coordinación de Protecciones para la Línea de Transmisión de Tres Terminales Manduriacu-Santo Domingo-Los Bancos a 69 kV. 151 hojas. Quito : EPN.es_ES
dc.identifier.otherT-IE/4403/CD 7598-
dc.identifier.urihttp://bibdigital.epn.edu.ec/handle/15000/17017-
dc.descriptionCon la expansión del Sistema Nacional de Transmisión se prevé la construcción de la línea de transmisión Manduriacu – Santo Domingo a 230 kV, para conectar la central Manduriacu con la barra de 230 kV de la Subestación Santo Domingo. Inicialmente se energiza los tramos existentes desde Manduriacu y a través de la subestación Los Bancos se transmite a un nivel de 69 kV hasta Santo Domingo. En estas condiciones, la nueva topología de línea se forma con tres terminales en el cual se aplican las técnicas de coordinación de protecciones eléctricas. En base a la información obtenida del operador del sistema, se ha modelado los tramos de línea con estructuras, tipo de conductor y disposición de circuitos, así como la adecuada selección y ajustes de relés para proteger esta línea. Con uso del programa computacional PowerFactory, se realizan las simulaciones de fallas en la zona protegida incluyendo las barras cercanas y en diferentes estados de demanda eléctrica, analizando principalmente la respuesta de la protección diferencial, de distancia, de sobrecorriente y de bajo voltaje que fueron debidamente coordinadas según el caso, para una protección efectiva de la línea de transmisión que ha sido el objeto de estudio.es_ES
dc.description.abstractWith the expansion of the National Transmission System, the construction of the Manduriacu - Santo Domingo 230 kV transmission line is planned to connect the Manduriacu plant with the 230 kV bar at the Santo Domingo Substation. Initially it energizes the existing sections from Manduriacu and through the substation Los Bancos is transmitted to a level of 69 kV to Santo Domingo. In these conditions, the new line topology is formed with three terminals in which the techniques of coordination of electrical protections are applied. Based on the information obtained from the system operator, it has been modeled the line sections with structures, type of conductor and arrangement of circuits, as well as the appropriate selection and adjustments of relays to protect this line. With the use of the PowerFactory software, fault simulations are performed in the protected area including nearby bars and in different states of electrical demand, analyzing mainly the response of the differential, distance, overcurrent and low voltage protection that were properly Coordinated according to the case, for an effective protection of the transmission line that has been the object of study.es_ES
dc.description.sponsorshipPérez Yauli, Fabián Ernesto, directores_ES
dc.language.isospaes_ES
dc.publisherQuito, 2017.es_ES
dc.rightsopenAccess-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/-
dc.subjectLINEAS DE TRANSMISIONes_ES
dc.subjectPROTECCIONES ELECTRICASes_ES
dc.subjectAPLICACIONES DE COMPUTADORes_ES
dc.titleEstudio de Coordinación de Protecciones para la Línea de Transmisión de Tres Terminales Manduriacu-Santo Domingo-Los Bancos a 69 kVes_ES
dc.typebachelorThesises_ES
Aparece en las colecciones:Tesis Ingeniería Eléctrica (IE)

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
CD-7598.pdf7,4 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.