Por favor, use este identificador para citar o enlazar este ítem: http://bibdigital.epn.edu.ec/handle/15000/17178
Registro completo de metadatos
Campo DCValorLengua/Idioma
dc.contributor.authorTituaña Andrade, Alexandra Rocío-
dc.date.accessioned2017-04-03T16:46:35Z-
dc.date.available2017-04-03T16:46:35Z-
dc.date.issued2017-03-30-
dc.identifier.citationTituaña Andrade, A. R. (2017). Auditoría del Sistema de Protecciones de Media Tensión. Caso de estudio Novacero S.A. 137 hojas. Quito : EPN.es_ES
dc.identifier.otherT-IE/4421/CD 7697-
dc.identifier.urihttp://bibdigital.epn.edu.ec/handle/15000/17178-
dc.descriptionEn el proyecto se realiza el estudio de coordinación de protecciones integral de la planta NOVACERO, con el objetivo de mejorar el sistema de protecciones implementado en la actualidad. Para esto se realiza la modelación del sistema eléctrico de la planta NOVACERO en el programa de simulación PowerFactory DigSilent, con esto se procede a realizar el análisis de flujo de carga y el estudio de cortocircuitos, estas simulaciones se las realiza de acuerdo a la norma IEC 60909. Se obtienen las curvas tiempo-corriente de cada una de las ramas de la planta NOVACERO, de las cuales se puede observar que se coordinan de manera selectiva en cada una de sus zonas de protección, respetando el margen de tiempo de actuación entre ellas. Con los resultados se puede comparar el sistema de protecciones actual con el que se realiza en el proyecto, el cual presenta un contraste en cuanto en los valores de calibración de los relés de sobrecorriente, valores nominales de fusibles y su ubicación en el sistema, por lo tanto con estos resultados se puede sugerir los cambios para que la confiabilidad del sistema eléctrico de NOVACERO mejore.es_ES
dc.description.abstractThe project carries out an integral study of protection coordination of the industrial plant NOVACERO, in order to improve the protection system currently settled. For this a modeling of the electrical system of the plant NOVACERO is performed with aid of the simulation program Power Factory DigSilent, therefore a load flow and short-circuit studies are carried out, these simulations are performed in accordance with IEC 60909 standard. The curves time vs current are obtained from each of the branches of the industrial plant Novacero, from where it can be observed that they are selectively coordinated in each of their protection zones respecting the action time interval between them. With the results it is possible to compare the current protection system with the one performed in the project, which shows a difference in the calibration values of the overcurrent relays, nominal fuse ratings and their location in the system, therefore with these results it is possible to suggest changes in NOVACERO plant in order to improve the reliability of the electrical system.es_ES
dc.description.sponsorshipSalazar Yépez, Gabriel Benjamín, directores_ES
dc.language.isospaes_ES
dc.publisherQuito, 2017.es_ES
dc.rightsopenAccesses_ES
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/-
dc.subjectSISTEMAS ELECTRICOS DE POTENCIAes_ES
dc.subjectPROTECCIONES ELECTRICASes_ES
dc.subjectAPLICACIONES DE COMPUTADORes_ES
dc.titleAuditoría del Sistema de Protecciones de Media Tensión. Caso de estudio Novacero S.A.es_ES
dc.typebachelorThesises_ES
Aparece en las colecciones:Tesis Ingeniería Eléctrica (IE)

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
CD-7697.pdf11,97 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.