Por favor, use este identificador para citar o enlazar este ítem: http://bibdigital.epn.edu.ec/handle/15000/17419
Registro completo de metadatos
Campo DCValorLengua/Idioma
dc.contributor.authorLozada Ulloa, Rodrigo Javier-
dc.date.accessioned2017-06-21T17:02:16Z-
dc.date.available2017-06-21T17:02:16Z-
dc.date.issued2017-06-15-
dc.identifier.citationLozada Ulloa, R. J. (2017). Metodología para la identificación de pozos con bajo rendimiento productivo en los Bloques 64 y 65 del Oriente Ecuatoriano. 175 hojas. Quito : EPN.es_ES
dc.identifier.otherT-GMP/0715/CD 7917-
dc.identifier.urihttp://bibdigital.epn.edu.ec/handle/15000/17419-
dc.descriptionEn primera instancia se realiza una descripción geológica, petrofísica, comportamiento de la presión, datos PVT y producción actual de los Bloques 64 y 65. A continuación se realiza una introducción al programa OFM™ y se estiman las reservas remanentes de crudo por el método de curvas de declinación. Posteriormente se seleccionan aquellos pozos que poseen un bajo rendimiento productivo, es decir, un bajo aporte de fluidos; para ello se utiliza el método de los cuatro cuadrantes (Índice de Heterogeneidad y Análisis de Eficiencia de Completamiento), una vez realizada la selección, se ordenan los pozos de acuerdo a sus reservas remanentes y se eligen los que posean mayor oportunidad de incremento de producción. De los pozos candidatos se elaboran gráficas de acumulados, comportamiento del WOR y su derivada para detectar problemas de producción excesiva de agua, estado mecánico actual, y se analizan pruebas de restauración de presión para descartar o confirmar la presencia de daño. Se recomiendan trabajos de reacondicionamiento con el fin de incrementar la producción de crudo para lo cual se elaboran curvas IPR y así cuantificar dicho incremento. Finalmente se evalúa económicamente el proyecto mediante el cálculo de indicadores como VAN, TIR, PRI, B/C y se detallan conclusiones y recomendaciones.es_ES
dc.description.abstractIn the first instance, a geological, petrophysical, pressure behavior, PVT data and current production of Blocks 64 and 65 are performed. The OFM ™ program is then introduced and the remaining oil reserves are estimated by the method of Decline Curve Analysis (DCA). Subsequently wells that have a low performance are selected, this is done using the four quadrants method (Heterogeneity Index and Completion Efficiency Analysis), once the selection is made, the wells are sorted according to their remaining reserves and those with the best opportunity to increase production are selected. From the candidate wells accumulated fluid graphs are performed, WOR behavior and its derivative are developed to detect problems of excessive water production, current mechanical state, and Build Up´s are analyzed to discard or confirm the presence of reservoir skin. Workover are recommended in order to increase crude oil production for which IPR curves are elaborated to quantify this increase. Finally, the project is evaluated economically through the calculation of indicators such as Net Present Value (NPV), Internal Rate of Return (IRR), Payback Period, Benefit Cost Ratio (BCR), and then conclusions and recommendations are detailed.es_ES
dc.description.sponsorshipCerón Guerra, Ignacio Bladimir, directores_ES
dc.language.isospaes_ES
dc.publisherQuito, 2017.es_ES
dc.rightsopenAccesses_ES
dc.subjectSISTEMAS DE PRODUCCIÓNes_ES
dc.subjectYACIMIENTOSes_ES
dc.titleMetodología para la identificación de pozos con bajo rendimiento productivo en los Bloques 64 y 65 del Oriente Ecuatorianoes_ES
dc.typebachelorThesises_ES
Aparece en las colecciones:Tesis Ingeniería en Petróleos (IPET)

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
CD-7917.pdf17,13 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.