Por favor, use este identificador para citar o enlazar este ítem: http://bibdigital.epn.edu.ec/handle/15000/19072
Registro completo de metadatos
Campo DCValorLengua/Idioma
dc.contributor.authorBombón Medina, Wilmer Fernando-
dc.date.accessioned2018-01-12T15:17:39Z-
dc.date.available2018-01-12T15:17:39Z-
dc.date.issued2018-01-12-
dc.identifier.citationBombón Medina, W. F. (2018). Plan de intervención en pozos en espera de reacondicionamiento para la reducción de pérdidas de producción en el bloque FBM. 98 hojas. Quito : EPN.es_ES
dc.identifier.otherT-GMP/0767/CD 8474-
dc.identifier.urihttp://bibdigital.epn.edu.ec/handle/15000/19072-
dc.descriptionEn el presente trabajo de titulación se realiza un plan de intervención de pozos en espera de reacondicionamiento para reducir las pérdidas de producción en el bloque FBM, esto considerando historiales de producción, análisis petrofísico, correlaciones estructurales, historiales de intervenciones, presiones de reservorio, pruebas PVT, pruebas de presión, cálculos de IPR´s. Las principales causas de espera de reacondicionamiento son debido al bajo aporte de producción y también por el cambio abrupto en el potencial del pozo, ya que al ser activados en estas condiciones el método de levantamiento artificial BES no trabajaría acorde al caudal óptimo ó a su vez, se seguirá perdiendo potencial haciéndose mayor el daño en el pozo. Para enfrentar este problema se realiza un análisis con el afán de proponer un tipo de intervención que permita incrementar la producción recuperando el potencial perdido y permitiendo trabajar al sistema de levantamiento en condiciones idóneas para tener una mayor vida útil. Además se determina el escenario de producción que se tendrá con trabajo propuesto y se compara con los resultados de las operaciones una vez efectuadas. Finalmente se plantean los escenarios para la recuperación de la inversión y demostración de la viabilidad de las operaciones de optimización realizadas.es_ES
dc.description.abstractIn the present titling work, a well intervention plan is being carried out in order to reduce the losses of production in the FBM block, considering production histories, petrophysical analysis, structural correlations, history of interventions, reservoir pressures, PVT tests, pressure tests, IPR calculations. The main causes of waiting for reconditioning are due to the low input of production and also by the abrupt change in the potential of the well since to be activated in these conditions the artificial lifting method PPS would not work according to the optimal flow or in turn will be followed losing potential by increasing the damage in the well. To address this problem, an analysis is carried out with the aim of proposing a type of intervention that allows to increase the production recovering the lost potential and allowing to work to the lifting system in ideal conditions to have a longer useful life. In addition, the production scenario to be taken with proposed work is determined and compared to the results of operations once performed. Finally, the scenarios are presented for the recovery of the investment and demonstration of the feasibility of the optimization operations carried out.es_ES
dc.description.sponsorshipPaz Villarroel, José Francisco, directores_ES
dc.language.isospaes_ES
dc.publisherQuito, 2018.es_ES
dc.rightsopenAccesses_ES
dc.subjectREACONDICIONAMIENTO DE POZOSes_ES
dc.subjectSISTEMAS DE PRODUCCIÓNes_ES
dc.titlePlan de intervención en pozos en espera de reacondicionamiento para la reducción de pérdidas de producción en el bloque FBMes_ES
dc.typebachelorThesises_ES
Aparece en las colecciones:Tesis Ingeniería en Petróleos (IPET)

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
CD-8474.pdf5,75 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.