Por favor, use este identificador para citar o enlazar este ítem: http://bibdigital.epn.edu.ec/handle/15000/19374
Registro completo de metadatos
Campo DCValorLengua/Idioma
dc.contributor.authorLópez Sánchez, Ana Belén-
dc.date.accessioned2018-04-26T21:57:05Z-
dc.date.available2018-04-26T21:57:05Z-
dc.date.issued2018-04-26-
dc.identifier.citationLópez Sánchez, A. B. (2018). Estudio para la optimización de la limpieza de hoyo en pozos horizontales y altamente desviados del campo Edén Yuturi. 169 hojas. Quito : EPN.es_ES
dc.identifier.otherT-GMP/0794/CD 8758-
dc.identifier.urihttp://bibdigital.epn.edu.ec/handle/15000/19374-
dc.descriptionEn este trabajo se ha realizado un estudio de la optimización de la limpieza de los pozos, mediante el análisis de los problemas operativos asociados a la limpieza presentados durante los años 2015 – 2017 en el campo Edén Yuturi, los cuales son: obstrucciones en la tubería, problemas de asentamiento de herramientas, pega de herramientas y presencia de residuos en el equipo BES. Con el objetivo de solucionar estos problemas se ha estudiado el desempeño de las diferentes herramientas especializadas para la limpieza y el desempeño de las píldoras viscosas. Las píldoras viscosas fueron elaboradas en el laboratorio con goma xantana clarificada, las concentraciones elegidas fueron de 2 lb/bl, 2,5 lb/bl, 3 lb/bl, 3,5 lb/bl, 4lb/bl, 4,5 lb/bl, con ellas se hicieron pruebas de laboratorio para determinar sus propiedades reológicas. La información obtenida sirvió para hacer las simulaciones en el programa VCS y determinar la concentración mínima necesaria para mejorar los resultados de la limpieza. Para evaluar a las herramientas se hizo un análisis comparativo entre ellas tomando en cuenta el tipo de trabajo, el grado de dificultad de la limpieza, la configuración mecánica, el tipo de arreglo y la cantidad de residuos recogidos por cada uno.es_ES
dc.description.abstractThis work is a study of the optimization of the cleaning up wellbores, by analyzing the operational problems associated with the cleaning presented during the years 2015 - 2017 in the Yuturi Eden field. These problems are obstructions in the pipeline, problems of settling of tools, sticking of tools and presence of waste in the EPS equipment. In order to solve these problems, the performance of the different specialized tools for cleaning and the performance of viscous pills has been analyze. The viscous pills were made in the laboratory with clarified xanthan gum, the concentrations chosen were 2 lb / bl, 2.5 lb / bl, 3 lb / bl, 3.5 lb / bl, 4 lb / bl, 4.5 lb / bl. The laboratory tests were made in them, in order to determine their rheological properties. The information obtained served to make the simulations in the VCS program and determine the minimum concentration necessary to improve the cleaning results. To evaluate the tools, a comparative analysis was made between them taking into account the type of work, the degree of difficulty of the cleaning, the mechanical configuration, the type of arrangement and the amount of waste collected by each one.es_ES
dc.description.sponsorshipGómez Soto, Franklin Vinicio, directores_ES
dc.language.isospaes_ES
dc.publisherQuito, 2018.es_ES
dc.rightsopenAccesses_ES
dc.subjectPERFORACION DE POZOSes_ES
dc.subjectPOZOS PETROLEROSes_ES
dc.subjectPOZOS HORIZONTALESes_ES
dc.titleEstudio para la optimización de la limpieza de hoyo en pozos horizontales y altamente desviados del campo Edén Yuturies_ES
dc.typebachelorThesises_ES
Aparece en las colecciones:Tesis Ingeniería en Petróleos (IPET)

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
CD-8758.pdf2,94 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.