Por favor, use este identificador para citar o enlazar este ítem: http://bibdigital.epn.edu.ec/handle/15000/19461
Registro completo de metadatos
Campo DCValorLengua/Idioma
dc.contributor.authorAndrade Suárez, Marco Antonio-
dc.date.accessioned2018-06-08T14:54:17Z-
dc.date.available2018-06-08T14:54:17Z-
dc.date.issued2018-06-08-
dc.identifier.citationAndrade Suárez, M. A. (2018). Planificación a corto plazo del sistema de distribución de la subestación Cayambe incorporando el programa de cocinas de inducción. 173 hojas. Quito : EPN.es_ES
dc.identifier.otherT-IE/4675/CD 8856-
dc.identifier.urihttp://bibdigital.epn.edu.ec/handle/15000/19461-
dc.descriptionEn el presente estudio se realizó un análisis mediante simulación de las condiciones de operación del sistema de distribución de la Subestación Cayambe, que consta 5 alimentadores primarios para brindar el servicio eléctrico a las parroquias de Cayambe, Tabacundo, Olmedo (Pesillo), Tupigachi y Cangahua. Se detectó varios problemas operativos en este sistema de distribución, principalmente con el voltaje y pérdidas técnicas de potencia y energía, razón por la cual fue necesario realizar algunas modificaciones a la red. Para realizar dichas modificaciones y analizar las condiciones futuras de operación de los 5 alimentadores, previamente se realizó una proyección de demanda para un plazo de 3 años. Además, dentro del análisis de consideró transferir carga a una nueva subestación de distribución llamada Cananvalle, misma que entrará en operación dentro este plazo establecido. Una vez establecidas las configuraciones necesarias para la red, se realizó un análisis financiero, con el objetivo de determina si estos proyectos con económicamente viables.es_ES
dc.description.abstractIn the present technical study was performed an analysis by simulation about the “Distribution System of the Cayambe Substation” operating conditions, which has 2 power transformers with a capacity of 10 MVA (ONAN / ONAF), connected in parallel, from where 5 primary circuits are derived to provide electric service to the parishes of Cayambe, Tabacundo, Olmedo (Pesillo), Tupigachi and Cangahua. Several operational problems were detected in this distribution system, mainly with voltage and technical power and energy losses.In order to perform modifications to the network and analyze the future operating conditions of the 5 primary circuits, a demand projection was previously made within a period of 3 years. In addition, it was considered to transfer loads to a new distribution substation called Cananvalle, which will enter into operation within the established period. With the necessary configurations for the electrical network, a financial analysis was performed, in order to determine if these projects are economically feasiblees_ES
dc.description.sponsorshipSalazar Yépez, Gabriel Benjamín, directores_ES
dc.language.isospaes_ES
dc.publisherQuito, 2018.es_ES
dc.rightsopenAccesses_ES
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/-
dc.subjectENERGÍA ELÉCTRICAes_ES
dc.subjectSISTEMAS DE DISTRIBUCIÓNes_ES
dc.subjectREDES ELÉCTRICASes_ES
dc.titlePlanificación a corto plazo del sistema de distribución de la subestación Cayambe incorporando el programa de cocinas de inducciónes_ES
dc.typebachelorThesises_ES
Aparece en las colecciones:Tesis Ingeniería Eléctrica (IE)

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
CD-8856.pdf2,86 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.