Por favor, use este identificador para citar o enlazar este ítem: http://bibdigital.epn.edu.ec/handle/15000/23659
Registro completo de metadatos
Campo DCValorLengua/Idioma
dc.contributor.authorMontes Reina, Diego Andrés-
dc.date.accessioned2023-03-08T17:48:32Z-
dc.date.available2023-03-08T17:48:32Z-
dc.date.issued2023-02-
dc.identifier.citationDiego Andrés, M.R. (2023). Estudio técnico de la coordinación de protecciones para la máquina generadora U1 perteneciente a la Central Hidroeléctrica Sarapullo. 129 páginas. Quito : EPN.es_ES
dc.identifier.otherT-IE 5655 / CD 12966-
dc.identifier.urihttp://bibdigital.epn.edu.ec/handle/15000/23659-
dc.descriptionAnte la importancia de proteger al generador de una central eléctrica, el cual es uno de los elementos principales de un Sistema Eléctrico Potencia, se requiere la acertada operación de los sistemas de protección ante algún fenómeno de perturbación, de modo que se pueda salvaguardar la vida humana y evitar grandes pérdidas económicas. El presente trabajo de titulación tiene como objetivo la corroboración de la calibración del relé REG 670 implementado en la Unidad 1 del proyecto hidroeléctrico Toachi Pilatón, según el Estudio Técnico entregado por la empresa contratista encargada de la puesta en servicio, dicho objetivo se cumplió con la creación de una herramienta computacional que permite la simulación de las diferentes protecciones como : protección diferencial 87G, protección de sobrecorriente temporizada 51, protección de sobrevoltaje 59 y protección de baja y sobre frecuencia 81U/O. La herramienta computacional creada en el software MATLAB es capaz de comparar los datos teóricos (Estudio Técnico) con los datos reales obtenidos en campo, siendo modificables los parámetros de ajuste como corrientes de polarización, límites de voltajes, límites de frecuencia, tiempo de disparo (falla). Esto permitió asegurar una adecuada operación de las protecciones mencionadas de la Unidad 1, lo cual se evidencia en los resultados mostrados.es_ES
dc.description.abstractGiven the importance of protecting the generator of a power plant, which is one of the main elements of an Electrical Power System, the correct operation of the protection systems is required in the event of some disturbance phenomenon, so that life can be saved. and avoid large economic losses. The objective of this titling work is to corroborate the calibration of the REG 670 relay implemented in Unit 1 of the Toachi Pilatón hydroelectric project, according to the Technical Study delivered by the contractor company in charge of commissioning, said objective was fulfilled with the creation of a computational tool that allows the simulation of the different protections such as: differential protection 87G, timed overcurrent protection 51, overvoltage protection 59 and under and over frequency protection 81U/O. The computational tool created in the MATLAB software is capable of comparing the theoretical data (Technical Study) with the real data obtained in the field, being modifiable the adjustment parameters such as polarization currents, voltage limits, frequency limits, trip time (failure). This will guarantee an adequate operation of the aforementioned protections of Unit 1, which is evidenced in the results shown.es_ES
dc.language.isospaes_ES
dc.publisherQuito : EPN, 2023.es_ES
dc.rightsopenAccesses_ES
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/-
dc.subjectELECTRICIDADes_ES
dc.subjectGENERADORes_ES
dc.subjectPROTECCIÓN DE SOBRE CORRIENTEes_ES
dc.subjectPROTECCIÓN DE SOBREVOLTAJEes_ES
dc.subjectPROTECCIÓN DE BAJA Y SOBRE FRECUENCIAes_ES
dc.titleEstudio técnico de la coordinación de protecciones para la máquina generadora U1 perteneciente a la Central Hidroeléctrica Sarapullo.es_ES
dc.typebachelorThesises_ES
Aparece en las colecciones:Tesis Ingeniería Eléctrica (IE)

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
CD 12966.pdf2,87 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.