Por favor, use este identificador para citar o enlazar este ítem: http://bibdigital.epn.edu.ec/handle/15000/9041
Registro completo de metadatos
Campo DCValorLengua/Idioma
dc.contributor.authorAlmeida Serrano, Danny Javier-
dc.date.accessioned2015-01-07T21:50:17Z-
dc.date.available2015-01-07T21:50:17Z-
dc.date.issued2014-10-17-
dc.identifier.otherT-IE/4040/CD 6030-
dc.identifier.urihttp://bibdigital.epn.edu.ec/handle/15000/9041-
dc.description126 hojas : ilustraciones, 29 x 21 cm + CD-ROM 6030es_ES
dc.description.abstractResumen .- Este proyecto comprende un análisis del procedimiento que interviene en el desarrollo del diseño eléctrico y construcción de la línea de subtransmisión subterránea a 69 kV que interconecta las subestaciones ZPF y El Vergel en el bloque 18. Se realiza el análisis del diseño eléctrico en el plano del perfil longitudinal, se analiza las características técnicas de la línea y del conductor, (calibre, capacidad de conducción, protecciones). En la parte constructiva se ve los métodos a utilizar para el tendido de cables, preparación del terreno para el tendido, excavación mecánica y manual, selección de la bobina y la realización de empalmes, además se analiza las pruebas eléctricas a realizar al cable y el diseño para cruces especiales (ríos, pantanos), se elabora la lista de materiales y presupuesto referencial del proyecto. Adicional se realiza el análisis de los riesgos que se tiene en la construcción de líneas subterráneas, qué se debe hacer para prevenir accidentes, inspección de herramientas y equipos, cual es el equipo de protección personal a usar y los primeros auxilios en caso de accidente. Además se ve los aspectos que intervienen en el estudio de impacto ambiental para la construcción de líneas subterráneas. Abstract .- This project includes an analysis of the process involved in the development of electrical design and construction of underground subtransmission line to 69 kV interconnecting the ZPF and El Vergel substations in block 18. electrical design analysis is performed at the level of longitudinal profile, the technical characteristics of the line and the conductor is analyzed, (size, transfer capacity, protection). In the constructive part is the methods used for laying cables, preparing the ground for laying, mechanical and manual excavation, selection of the coil and making splices, also the electrical testings for the cable are analyzed, and design for special crossings (rivers, swamps), the material's list and referential project budget is prepared. Additional analysis of the risks you have in the construction of underground lines is done, what should be done to prevent accidents, inspection of tools and equipment, which is the personal protective equipment to use and first aid in case of accident. Also see the aspects involved in the environmental impact study for the construction of underground lines.es_ES
dc.description.sponsorshipAvilés Merino, Fausto Guillermo, directores_ES
dc.language.isospaes_ES
dc.publisherQuito : EPN, 2015.es_ES
dc.rightsopenAccess-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/-
dc.subjectAlto voltajees_ES
dc.subjectLíneas de transmisiónes_ES
dc.subjectSeguridad industriales_ES
dc.titleDiseño y construcción de la línea se subtransmisión subterránea a 69 kV., desde la S/E ZPF en el bloque 18 hasta la S/E El Vergel, para Petroamazonas E.P.es_ES
dc.typebachelorThesises_ES
Aparece en las colecciones:Tesis Ingeniería Eléctrica (IE)

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
CD-6030.pdfTesis completa6,16 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.