dc.identifier.citationMonge García, G. V. (2017). Determinación de los tiempos estándar de operación del sistema de fabricación de contenedores de 2 400 L de carga lateral en la empresa Industria Metálica Cotopaxi (IMC), mediante un estudio de tiempos y movimientos. 333 hojas. Quito : EPN.es_ES
dc.identifier.otherT-MII/0138/CD 7935-
dc.identifier.urihttp://bibdigital.epn.edu.ec/handle/15000/17437-
dc.descriptionEste trabajo tuvo como objetivo determinar los tiempos estándar de las operaciones necesarias para la fabricación de los contenedores de 2 400 L de carga lateral, además de proponer opciones de mejora como resultado de la experiencia del investigador y por los tiempos de espera y el porcentaje de utilización de los recursos generados por el simulador utilizado. Para esto se identificaron las piezas fabricadas, se realizó un levantamiento inicial de las operaciones y los operadores involucrados en el sistema, se levantaron los planos de las plantas productivas Colaisa y Andi Hierro y se actualizaron los planos de las instalaciones de la Industria Metálica Cotopaxi, además se ejecutó un estudio para obtener los tiempos estándares de las piezas seleccionadas, después se utilizó el simulador que, mediante el análisis del proceso planteado, género como resultado el número de unidades producidas, los tiempos de espera y el porcentaje de utilización de los operadores.es_ES
dc.description.abstractThis work aimed the raising of the standard times of operations required for the manufacture of the containers of 2 400 L lateral load, in addition to the search for generation of proposals for the improvement approached by the experience of the executor of the study, like the waiting times and the percentage of use of the resources generated by the simulator used. For this, the manufactured parts were identified, an initial survey of the operations and operators involved in the system was carried out, the plans of the Colaisa and Andi Hierro production plants were generated and the plans of the Industria Metálica Cotopaxi, too. Also, a study was executed to obtain the standard times of the selected pieces. Then the simulator was used, which, through the analysis of the process, resulted in the number of units produced, the waiting times and the percentage of use of the operators.es_ES
dc.description.sponsorshipBuitrón Flores, Pedro Enrique, directores_ES
dc.language.isospaes_ES
dc.publisherQuito, 2017.es_ES
dc.rightsopenAccesses_ES
dc.subjectSISTEMAS DE PRODUCCIONes_ES
dc.subjectDISEÑO DE PLANTASes_ES
dc.titleDeterminación de los tiempos estándar de operación del sistema de fabricación de contenedores de 2 400 L de carga lateral en la empresa Industria Metálica Cotopaxi (IMC), mediante un estudio de tiempos y movimientoses_ES
dc.typemasterThesises_ES
Aparece en las colecciones:Tesis Maestría en Ingeniería Industrial y Productividad (FIQA)

Ficheros en este ítem:
No hay ficheros asociados a este ítem.


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.