Por favor, use este identificador para citar o enlazar este ítem: http://bibdigital.epn.edu.ec/handle/15000/18781
Registro completo de metadatos
Campo DCValorLengua/Idioma
dc.contributor.authorGiler Díaz, Marlon Iván-
dc.contributor.authorRomano Redruello, Pablo Javier-
dc.date.accessioned2017-09-18T18:54:21Z-
dc.date.available2017-09-18T18:54:21Z-
dc.date.issued2017-09-18-
dc.identifier.citationGiler Díaz, M. I., & Romano Redruello, P. J. (2017). Diseño y construcción de un secador solar indirecto de arena aplicada en sandblasting para la empresa Symep S.A. 127 hojas. Quito : EPN.es_ES
dc.identifier.otherT-IM/1911/CD 8170-
dc.identifier.urihttp://bibdigital.epn.edu.ec/handle/15000/18781-
dc.descriptionEn el presente trabajo de titulación se diseñó y construyó un secador solar indirecto que sirve para el secado de arena utilizada en el proceso de sandblasting, para la empresa Symep S.A. Primero se obtuvieron las curvas de secado de la arena mediante ensayos de laboratorio, con estos datos se procedió a calcular el flujo de calor necesario para retirar la humedad del producto, que resultó en 1147,36 [W]. Luego, se dimensionó el colector solar para suministrar dicho flujo de calor, con un área efectiva de 3,2 m2. Previo a la construcción se realizó un análisis estructural con un software de diseño, el cual confirmó que la estructura soporta la carga de funcionamiento. A continuación se elaboraron los planos constructivos del equipo. El funcionamiento del equipo se evaluó mediante pruebas en vacío, que dieron como resultado una temperatura promedio al ingreso de la cámara de secado de 43,03 ºC y una eficiencia en el colector solar de 34,31%. El costo total del secador fue de $ 8163,32.es_ES
dc.description.abstractIn the present thesis an indirect solar dryer was designed and built for drying sand to be used in the process of sandblasting, for the company Symep S.A. First, the drying curves of the sand were obtained through laboratory testing, with these data the next step is to calculate the heat flow needed to remove moisture from the product, which resulted in 1147,36 [W]. Then, the solar collector was dimensioned to supply the heat flow, with an effective area of 3.2 m2. Prior to the construction, the structural analysis was performed with a computer assisted design, which confirmed that the structure supports the functional load. Then the constructive plans of the equipment were developed. The operation of the equipment was evaluated using tests without the load, which resulted in an average temperature entering the drying chamber of 43,03°C and a solar collector efficiency of 34,31%. The total cost of the dryer was $8163,32.es_ES
dc.description.sponsorshipPortilla Aguilar, Ángel Adalberto, directores_ES
dc.language.isospaes_ES
dc.publisherQuito, 2017.es_ES
dc.rightsopenAccesses_ES
dc.subjectTRANSFERENCIA DE CALORes_ES
dc.subjectENERGÍAS ALTERNATIVASes_ES
dc.titleDiseño y construcción de un secador solar indirecto de arena aplicada en sandblasting para la empresa Symep S.A.es_ES
dc.typebachelorThesises_ES
Aparece en las colecciones:Tesis Mecánica (IM)

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
CD-8170.pdf7,09 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.