Por favor, use este identificador para citar o enlazar este ítem: http://bibdigital.epn.edu.ec/handle/15000/20128
Registro completo de metadatos
Campo DCValorLengua/Idioma
dc.contributor.authorLara Arias, Santiago Javier-
dc.date.accessioned2019-03-21T19:08:43Z-
dc.date.available2019-03-21T19:08:43Z-
dc.date.issued2019-02-05-
dc.identifier.citationLara Arias, S. J. (2019). Análisis de riesgos como herramienta de gestión para prevenir problemas operacionales en la perforación de la sección 12 ¼’’ del bloque 43 plataforma Tiputini C. 66 hojas. Quito : EPN.es_ES
dc.identifier.otherT-MVE/0737/CD 9575-
dc.identifier.urihttp://bibdigital.epn.edu.ec/handle/15000/20128-
dc.descriptionEste trabajo se desarrolló con el objetivo de realizar un análisis de riesgos para prevenir problemas operacionales en la perforación de la sección 12 ¼’’ del Bloque 43 plataforma Tiputini C. Para realizarlo se aplicó el Método de Mosler identificando los problemas operacionales que se presentaron durante la perforación de 22 pozos en la Plataforma Tiputini C en los años 2016 y 2017. Después de realizar un análisis de cada uno de los problemas operacionales se procedió a evaluarlos con el fin de determinar el nivel de riesgo inicial, lo que permitió establecer qué medidas de prevención y mitigación se puede aplicar a cada problema operacional con el fin de poder prevenirlos (disminuir la probabilidad) y/o reducirlos (disminuir el carácter de riesgo o severidad) y con su aplicación se determinó el nivel de riesgo residual. Los resultados del análisis se presentaron en un cuadro de Análisis y Control de Riesgos el mismo que servirá como una herramienta de gestión para el Departamento de Perforación de Petroamazonas EP en el Campo Tiputini. El análisis de riesgos aplicado en las operaciones de perforación de la sección de 12 ¼’’ en la plataforma Tiputini C, permitió disminuir el riesgo inicial promedio de 434.67 puntos a un riesgo residual promedio de 284.33, minimizando y/o evitando tiempos no productivos.es_ES
dc.description.abstractThe current job was developed with the objective to perform a risk analysis to prevent operational problems during drilling 12 ¼'' section of 43 Block, Tiputini C platform. In order to carry out this analysis, the Mosler Method was applied, which one identified the operational problems happened during drilling of 22 wells in Tiputini C Platform in 2016 and 2017. After performing an analysis of operational problems, each one were evaluated in order to determine the initial risk level, which allowed to establish which preventive and mitigative measures can be applied to each operational problem in order to be able to prevent them (decrease the likelihood) and / or reduce them (decrease the nature of risk or severity) and with their application the level of residual risk was determined. The results of this analysis were presented in a Risk Analysis and Control Chart, which will serve as a management tool for Petroamazonas EP's Drilling Department in the Tiputini Field. The risk analysis applied in the drilling operations of the 12 ¼ "section on the Tiputini C platform allowed to reduce the average initial risk from 434.67 points to an average residual risk of 284.33 points, minimizing and / or avoiding non-productive times.es_ES
dc.description.sponsorshipValencia Tapia, Raúl Armando, directores_ES
dc.language.isospaes_ES
dc.publisherQuito, 2019.es_ES
dc.rightsopenAccesses_ES
dc.subjectMEDIDAS DE CONTROLes_ES
dc.subjectANÁLISIS DE RIESGOSes_ES
dc.titleAnálisis de riesgos como herramienta de gestión para prevenir problemas operacionales en la perforación de la sección 12 ¼’’ del bloque 43 plataforma Tiputini Ces_ES
dc.typemasterThesises_ES
Aparece en las colecciones:Tesis Maestría en Gestión para la Exploración y Producción de Petróleo (FDGyP)

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
CD 9575.pdf4,46 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.