Por favor, use este identificador para citar o enlazar este ítem: http://bibdigital.epn.edu.ec/handle/15000/20466
Registro completo de metadatos
Campo DCValorLengua/Idioma
dc.contributor.authorLazcano Delgado, Carlos Alberto-
dc.date.accessioned2019-09-09T18:47:01Z-
dc.date.available2019-09-09T18:47:01Z-
dc.date.issued2019-06-28-
dc.identifier.citationLazcano Delgado, C. A. (2019). Matriz de toma de decisiones para la gestión de la generación eléctrica a gas en un campo petrolero. 98 hojas. Quito : EPN.es_ES
dc.identifier.otherT-MVE/0795/CD 9950-
dc.identifier.urihttp://bibdigital.epn.edu.ec/handle/15000/20466-
dc.descriptionPara el desarrollo de la matriz de toma de decisiones en proyectos de generación eléctrica, se realizó evaluaciones geológicas, estructurales, litologías y estratigrafía de cada arena, para estimar la capacidad de producción de petróleo y gas. Los análisis PVT permite verificar la calidad y propiedades del gas en cada arena; luego con el estimado de gas por cada año de producción, se evaluó la capacidad de generación de energía disponible, de esta manera conocer si se cubre los requerimientos del campo a lo largo de su tiempo de operación. En el estudio se plantearon tres escenarios: el escenario habitual donde el combustible utilizado es el diésel, el segundo escenario con al gas asociado como combustible y finalmente se analiza la ventaja del incremento de producción de gas en los costos de inversión (CAPEX) y operación (OPEX). Con la metodología Bow Tie - seguridad operativa se definió como Evento Principal el shutdown eléctrico, causado por las variaciones en el suministro de gas. Finalmente, se desarrolló un análisis de los aspectos administrativos, legales, financieros, ambientales, económicos y de mercado; para conocer si el cambio del combustible muestra índices económicos que generen una rentabilidad suficiente para proporcionar utilidad al proyecto.es_ES
dc.description.abstractFor the development of the decision-making matrix in power generation projects in an oil field, it was begin with evaluations of the geology, structures, lithologies and stratigraphy of each of the sands that have been considered in the oil field, next it was estimated the capacity for oil production and therefore gas production. Then, with the PVT analysis of each of of the sands, the gas quality and its properties were verified; with the gas estimate for each year production, the capacity of generation of available energy was evaluated and thus to will know the capacity that this covers of the field requirements throughout its operation time. In the study, three scenarios were considered: the first, the usual scenario where the fuel used is diesel; the second scenario considered the associated gas as fuel and the third scenario analyzes the advantage that exists in the increase of gas production in costs of investment (CAPEX) and operation (OPEX). To analyze operational safety, the Bow Tie methodology was used, in which the main event was defined as the electric shutdown, caused by variations in the supply of gas in an oil field. Finally, a specific analysis of the administrative, legal, financial, environmental, economic and market aspects was included; which will allow to know if the change of the fuel shows economic indexes that generate a profitability sufficient to provide utility to the projectes_ES
dc.description.sponsorshipGallegos Eras, Álvaro Vinicio, directores_ES
dc.language.isospaes_ES
dc.publisherQuito, 2019.es_ES
dc.rightsopenAccesses_ES
dc.subjectPETRÓLEOes_ES
dc.subjectENERGÍA ELÉCTRICAes_ES
dc.subjectGESTIÓNes_ES
dc.titleMatriz de toma de decisiones para la gestión de la generación eléctrica a gas en un campo petroleroes_ES
dc.typemasterThesises_ES
Aparece en las colecciones:Tesis Maestría en Gestión para la Exploración y Producción de Petróleo (FDGyP)

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
CD 9950.pdf4,07 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.