Por favor, use este identificador para citar o enlazar este ítem: http://bibdigital.epn.edu.ec/handle/15000/20972
Registro completo de metadatos
Campo DCValorLengua/Idioma
dc.contributor.authorPillana Pimbo, Álvaro Salomón-
dc.date.accessioned2020-07-22T15:01:58Z-
dc.date.available2020-07-22T15:01:58Z-
dc.date.issued2020-06-30-
dc.identifier.citationPillana Pimbo, A. S. (2020). Evaluación de riesgos del Sistema de reinyección de agua de una estación de Producción del Campo “Shushufindi-Aguarico” mediante la metodología Hazop. 108 hojas. Quito : EPN.es_ES
dc.identifier.otherT-GMP/0901/CD 10495-
dc.identifier.urihttp://bibdigital.epn.edu.ec/handle/15000/20972-
dc.descriptionEl sistema de reinyección agua de la estación de producción “x” del campo Shushufindi-Aguarico, maneja alrededor de 40.000 BAPD, debido al incremento de los trabajos de reacondicionamiento en los pozos productores, su producción incrementará en los próximos años, por lo que es necesario implementar una nueva bomba de alta presión la cual suplirá la capacidad de bombeo a futuro. Esta herramienta nos permite generar desviaciones que se pueden dar con respecto a las variables o procesos normales de operación de cada equipo que compone el sistema de Reinyección de Agua. Se procedió a seleccionar los nodos de procesos para el estudio e identificar las variables existentes en cada uno de ellos. La metodología inició generando una tabla de desviaciones con cada una de las variables en conjunto con el uso de palabras guía, que es parte de esta metodología. Luego se identificó las causas y consecuencias como resultado de la generación de desviaciones, para luego de un análisis identificar las salvaguardas existentes y evaluar cada una de ellas mediante la matriz de riesgos seleccionada para este estudio. Finalmente, a cada nivel de riesgo encontrado se elaboró recomendaciones y acciones necesarias para disminuir o mitigar el nivel de riesgo respectivamente.es_ES
dc.description.abstractThe water reinjection system of the production station "x" of the Shushufindi-Aguarico field, manages around 40,000 BAPD, due to the increase in workover works in the producing wells, its production will increase in the coming years, making it. It is necessary to implement a new high pressure pump which will supply future pumping capacity. This tool allows us to generate deviations that can occur with respect to the variables or normal operating processes of each equipment that makes up the Water Reinjection system. We proceeded to select the process nodes for the study and identify the existing variables in each one of them. The methodology started by generating a deviation table with each of the variables together with the use of guide words, which is part of this methodology. The causes and consequences were identified as a result of the generation of deviations, and after an analysis, identify the existing safeguards and evaluate each of them using the risk matrix selected for this study. Finally, at each level of risk found, recommendations and necessary actions were prepared to decrease or mitigate the level of risk, respectively.es_ES
dc.description.sponsorshipMartínez Villareal, Joana Salome, directoraes_ES
dc.language.isospaes_ES
dc.publisherQuito, 2020.es_ES
dc.rightsopenAccesses_ES
dc.subjectANÁLISIS DE RIESGOSes_ES
dc.subjectMETODOLOGÍA HAZOPes_ES
dc.subjectSEGURIDAD INDUSTRIALes_ES
dc.titleEvaluación de riesgos del Sistema de reinyección de agua de una estación de Producción del Campo “Shushufindi-Aguarico” mediante la metodología Hazopes_ES
dc.typebachelorThesises_ES
Aparece en las colecciones:Tesis Ingeniería en Petróleos (IPET)

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
CD 10495.pdf2,23 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.