Por favor, use este identificador para citar o enlazar este ítem: http://bibdigital.epn.edu.ec/handle/15000/10640
Registro completo de metadatos
Campo DCValorLengua/Idioma
dc.contributor.authorAndrango Diaz, Rommel Rafael-
dc.date.accessioned2015-06-03T17:59:23Z-
dc.date.available2015-06-03T17:59:23Z-
dc.date.issued2015-05-06-
dc.identifier.otherT-IC/0676/CD 6281-
dc.identifier.urihttp://bibdigital.epn.edu.ec/handle/15000/10640-
dc.description260 hojas : ilustraciones, 29 x 21 cm + CD-ROM 6281es_ES
dc.description.abstractResumen .- El presente proyecto de titulación tiene como objetivo general el determinar la factibilidad económica de construcción mediante dos procesos constructivos los cuales se basan en el diseño de conexiones soldadas y conexiones empernadas, y determinar su impacto en el costo total del proyecto, ya que la tendencia actual en el Ecuador es la construcción mediante estructura de acero. Para realizar este análisis se tomó como ejemplo de estudio el Proyecto Sebastián II, ubicado en Tonsupa, Esmeraldas. Mediante un análisis de mercado en el sector se determinó un costo inicial del metro cuadrado de construcción y un costo inicial de venta del metro cuadrado del proyecto, además de un tiempo promedio de construcción y entrega del mismo. Se realizó un estudio de ingeniería para los dos procedimientos estructurales, se efectuó el diseño hidrosanitario, un análisis de costos, además de un cronograma de actividades para los dos procedimientos constructivos. Finalmente se elaboró un estudio económico para determinar la rentabilidad y factibilidad de construcción de los dos procesos constructivos en estructura de acero. Como resultado se obtuvo que la estructura soldada es la más factible y rentable ya que generó un porcentaje mayor en los parámetros mencionados, respecto a la estructura apernada, ya que la tecnología y mano de obra aún no son suficiente recurso de producción y aprovechamiento en la estructura apernada. Abstract .- This titling project's general objective is to determine the economic feasibility of construction by two construction processes which are based on the design of welding connections and bolted connections, and determine their impact on the total cost of the project, since the current trend in Ecuador is building with steel structure. To perform this analysis was taken as example studio, located in Tonsupa, Esmeraldas Sebastian II Project. By analyzing market in an initial cost per square meter of construction and initial cost of sales per square meter of the project was determined, plus an average of building and delivering the same time. An engineering study for the two structural procedures are performed, the hidro sanitario design, a cost analysis was performed, and a schedule of activities for both construction procedures. Finally an economic study was designed to determine the profitability and feasibility of construction of the two construction processes in steel structure. As a result it was found that the welded structure is the most feasible and cost effective as it generated a higher percentage in the above parameters regarding bolted structure, as technology and labor are not enough resource production and utilization in the bolted structure.es_ES
dc.description.sponsorshipBarahona Pinto, Gustavo Antonio, directores_ES
dc.language.isospaes_ES
dc.publisherQuito : EPN, 2015.es_ES
dc.rightsopenAccess-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/-
dc.subjectEstructuras (Construcción)es_ES
dc.subjectConstrucción de aceroes_ES
dc.titleEvaluación, control y manejo de proyectos inmobiliarios: Caso del Edificio de Sebastián II a ejecutarse en Tonsupa, Esmeraldas, Ecuadores_ES
dc.typebachelorThesises_ES
Aparece en las colecciones:Tesis Ingenieria Civil y Ambiental (ICA)

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
CD-6281.pdf7,74 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.