Por favor, use este identificador para citar o enlazar este ítem: http://bibdigital.epn.edu.ec/handle/15000/16839
Registro completo de metadatos
Campo DCValorLengua/Idioma
dc.contributor.authorChamorro Ramírez, José Daniel-
dc.contributor.authorSalas Lara, Danny Javier-
dc.date.accessioned2016-11-15T22:26:30Z-
dc.date.available2016-11-15T22:26:30Z-
dc.date.issued2016-11-08-
dc.identifier.citationChamorro Ramírez, J. D., & Salas Lara, D. J. (2016). Estudio Técnico para la optimización del sistema de levantamiento artificial por BES en el campo MDC. 139 hojas. Quito : EPN.es_ES
dc.identifier.otherT-GMP/0671/CD 7418-
dc.identifier.urihttp://bibdigital.epn.edu.ec/handle/15000/16839-
dc.descriptionLos yacimientos del oriente ecuatoriano al no tener la suficiente presión de reservorio son completados con diversas tecnologías de levantamiento artificial, destacándose entre ellos el Bombeo Electrosumergible debido a su capacidad de control en la producción y a la adaptación a distintos modelos de simulación para su optimización. Pero al ser pozos susceptibles a variaciones en sus condiciones originales, necesitan un estudio, evaluación y mejoramiento continuo. El análisis nodal mediante el Simulador Pipesim (2013), permitió establecer parámetros y acciones de redimensionamiento, para predecir el comportamiento de producción de los pozos del campo Mauro Dávalos Cordero (MDC). Con los resultados obtenidos tras las acciones de redimensionamiento, se realizó el análisis económico con varios indicadores financieros, los cuales determinan la viabilidad y factibilidad de su aplicación en los pozos intervenidos.es_ES
dc.description.abstractThe reservoirs of eastern Ecuador, lacking sufficient reservoir pressure, are complemented by various artificial lift technologies, such as the Electrosumergible Pumping, due to its ability to control production and to adapt to different simulation models for optimization. But being wells susceptible to variations in their original conditions, they need a study, evaluation and continuous improvement. Nodal analysis using the Pipesim Simulator (2013), allowed to establish parameters and actions of resizing, to predict the production behavior of the wells of the field Mauro Dávalos Cordero (MDC). With the results obtained after the resizing actions, the economic analysis was carried out with several financial indicators, which determine the feasibility and feasibility of its application in the intervention wells.es_ES
dc.description.sponsorshipMelo Gordillo, Vinicio René, directores_ES
dc.language.isospaes_ES
dc.publisherQuito, 2016.es_ES
dc.rightsopenAccess-
dc.rights.urihttps://creativecommons.org/licenses/by-nc-nd/4.0/-
dc.subjectYACIMIENTOS PETROLEROSes_ES
dc.subjectPOZOS PETROLEROSes_ES
dc.subjectPRODUCCIONes_ES
dc.titleEstudio Técnico para la optimización del sistema de levantamiento artificial por BES en el campo MDCes_ES
dc.typebachelorThesises_ES
Aparece en las colecciones:Tesis Ingeniería en Petróleos (IPET)

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
CD-7418.pdf9,33 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.