dc.identifier.citationChicaiza Ojeda, S.B.(2024).Optimización del Control de Costos en Proyectos de Construcción en Ecuador: Un Enfoque Comparativo de las Metodologías AACE, PMI y Análisis de Precios Unitarios : Control de Costos usando los lineamientos de la Association for the Advancement of Cost Engineering (AACE), aplicados a la realidad ecuatoriana. 78 páginas. Quito : EPN, 2024.es_ES
dc.identifier.otherT-IC 1382/CD 14644-
dc.identifier.urihttp://bibdigital.epn.edu.ec/handle/15000/25878-
dc.descriptionEl estudio se fundamenta en los lineamientos de la Association for the Advancement of Cost Engineering (AACE), aplicados a un proyecto específico de corta duración y pequeña escala, siendo esta la asunción de una muestra de proyectos ecuatorianos de empresas pequeñas y medianas. La AACE ofrece un marco completo para la gestión y control de costos en proyectos, proporcionando herramientas y técnicas para asegurar una planificación y ejecución eficientes. Entre estas herramientas se encuentran la Gestión del Valor Ganado (EVM) y el Costeo Basado en Actividades (ABC), que fueron implementadas en el proyecto para evaluar su efectividad. El análisis comparó las ventajas y desventajas de usar estas metodologías frente a no usarlas. Aunque el proyecto duró alrededor de un mes, la implementación de EVM y ABC mostró una mejora notable en la gestión de costos, y beneficios mesurables de costos. Estos resultados sugieren que, incluso en proyectos pequeños, las metodologías respaldadas por la AACE pueden ofrecer beneficios significativos. Además, el estudio se contextualiza en la realidad ecuatoriana, donde la falta de un control de costos efectivo ha puesto en riesgo a muchos constructores. La contribuyen a una gestión de costos más sólida y a la sostenibilidad de los proyectos en Ecuador. Asimismo, estas herramientas pueden incrementar las ganancias de las empresas al optimizar los recursos y reducir los costos innecesarios, mejorando así la competitividad en el mercado.es_ES
dc.description.abstractThe study is based on the guidelines of the Association for the Advancement of Cost Engineering (AACE), applied to a specific project of short duration and small scale, assuming a sample of Ecuadorian projects of small and medium-sized companies. AACE offers a complete framework for project cost management and control, providing tools and techniques to ensure efficient planning and execution. Among these tools are Earned Value Management (EVM) and Activity Based Costing (ABC), which were implemented in the project to evaluate their effectiveness. The analysis compared the advantages and disadvantages of using these methodologies versus not using them. Although the project lasted about one month, the implementation of EVM and ABC showed a marked improvement in cost management, and measurable cost benefits. These results suggest that, even in small projects, AACE-supported methodologies can offer significant benefits. Furthermore, the study is contextualized in the Ecuadorian reality, where the lack of effective cost control has put many builders at risk. They contribute to stronger cost management and sustainability of projects in Ecuador. Furthermore, these tools can increase companies' profits by optimizing resources and reducing unnecessary costs, thus improving competitiveness in the market.es_ES
dc.description.sponsorshipPinto Gaibor, Pablo Alejandro, director.es_ES
dc.language.isospaes_ES
dc.publisherQuito : EPN, 2024.es_ES
dc.rightsopenAccesses_ES
dc.subjectCOSTEO ABCes_ES
dc.subjectCONTROL DE COSTOSes_ES
dc.subjectGESTIÓN DE COSTOSes_ES
dc.subjectCIVILes_ES
dc.titleOptimización del Control de Costos en Proyectos de Construcción en Ecuador: Un Enfoque Comparativo de las Metodologías AACE, PMI y Análisis de Precios Unitarios : Control de Costos usando los lineamientos de la Association for the Advancement of Cost Engineering (AACE), aplicados a la realidad ecuatoriana.es_ES
dc.typebachelorThesises_ES
Aparece en las colecciones:TIC - Civil

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
CD 14644.pdf7,93 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.