Por favor, use este identificador para citar o enlazar este ítem:
http://bibdigital.epn.edu.ec/handle/15000/25898
Registro completo de metadatos
Campo DC | Valor | Lengua/Idioma |
---|---|---|
dc.contributor.author | Torres Lima, Alexander Josué | - |
dc.contributor.editor | Cuenca Sánchez, Alan Daniel | - |
dc.date.accessioned | 2024-10-16T17:21:23Z | - |
dc.date.available | 2024-10-16T17:21:23Z | - |
dc.date.issued | 2024-10-16 | - |
dc.identifier.citation | Torres Lima, A.J.(2024). Repotenciación de la planta de control de nivel por presión hidrostática del laboratorio de tecnología industrial de la ESFOT : Implementación del sistema de control de nivel.76 páginas. Quito : EPN, 2024. | es_ES |
dc.identifier.other | T-TEM 0417/CD 14653 | - |
dc.identifier.uri | http://bibdigital.epn.edu.ec/handle/15000/25898 | - |
dc.description | El presente proyecto de integración curricular tiene como objetivo la repotenciación de la planta de control de nivel por presión hidrostática del Laboratorio de Tecnología Industrial LTI de la ESFOT. Ésta se implementó en dicho laboratorio y presenta problemas en su funcionamiento debido al paso del tiempo. El módulo es usado por los estudiantes de la carrera de Tecnología Superior en Electromecánica de la ESFOT para realizar prácticas en las materias de Control y Sistemas HMI e Instrumentación. El proyecto consta de siete capítulos que se detallan a continuación: Capítulo 1: Introducción, se describe con claridad el componente desarrollado del proyecto, junto con su objetivo general y los objetivos específicos. Además, se expone el alcance del proyecto, donde se delinean las acciones planificadas para lograr con los objetivos específicos planteados. Se incluyen fundamentos teóricos necesarios para el desarrollo del proyecto. Capítulo 2: Metodología, esta sección de manera específica detalla los requisitos del sistema y las medidas adoptadas para llevar a cabo la mejora de la planta. Además, incluye los planos esquemáticos, los componentes empleados, el desarrollo del algoritmo de control y la interfaz humano máquina HMI. Capítulo 3: Resultados, se presentan los resultados obtenidos a través de gráficos y videos que muestran las pruebas de funcionamiento de la planta. Además, incluyen los manuales de usuario y de mantenimiento en formato de video correspondiente a cada uno. Capítulo 4 y 5: Conclusiones y Recomendaciones, se registran comentarios sobre el trabajo realizado a partir de los resultados obtenidos en las pruebas de funcionamiento. Capítulo 6: Referencias Bibliográficas, en este apartado se hace referencia a las fuentes consultadas durante la elaboración del proyecto. Capítulo 7: Anexos, aquí se hallan documentos relevantes que, debido a su extensión, no fueron incluidos directamente en el cuerpo del documento principal, pero que contienen información relevante para el entendimiento del proyecto. | es_ES |
dc.description.abstract | The present curricular integration project aims to repower the level control plant by hydrostatic pressure of the Industrial Technology Laboratory (LTI) at ESFOT. This plant was implemented in the said laboratory and presents operational problems due to the passage of time. The module is used by students of the Higher Technology in Electromechanics program at ESFOT to carry out practical exercises in the subjects of Control and HMI Systems and Instrumentation. The project consists of seven chapters, which are detailed below: Chapter 1: Introduction clearly describes the developed component of the project, scope is outlined, delineating the planned actions to achieve the specific objectives. The theoretical foundations necessary for the project´s development is also included. Chapter 2: Methodology, this section specifically details the system requirements ant the measures taken to carry out the improvement of the plant. It also includes schematic diagrams, the components used, the development of the control algorithm, and the humanmachine interface (HMI). Chapter 3: Results, presents the results obtained through graphs and videos showing the plant´s functional tests. Additionally, user and maintenance manuals are included in video format corresponding to each one. Chapters 4 and 5: Conclusions and Recommendations, register comments on the work done based on the results obtained in the functional test. Chapter 6: Bibliographic References, this section references the sources consulted during the project´s development. Chapter 7: Annexes, here, relevant documents are found that, due to their length, were dot directly included in the main body of the document but contain relevant information for understanding the project. | es_ES |
dc.language.iso | spa | es_ES |
dc.publisher | Quito : EPN, 2024. | es_ES |
dc.rights | openAccess | es_ES |
dc.subject | PLC S7-1200 | es_ES |
dc.subject | CONTROL DE NIVEL | es_ES |
dc.subject | ALGORITMO DE CONTROL | es_ES |
dc.subject | TRANSMISOR PIEZOELÉCTRICO | es_ES |
dc.subject | HMI | es_ES |
dc.title | Repotenciación de la planta de control de nivel por presión hidrostática del laboratorio de tecnología industrial de la ESFOT : Implementación del sistema de control de nivel. | es_ES |
dc.type | Trabajo de Integración Curricular | es_ES |
Aparece en las colecciones: | TIC - Tecnología Superior en Electromecánica |
Ficheros en este ítem:
Fichero | Descripción | Tamaño | Formato | |
---|---|---|---|---|
CD 14653.pdf | 15,09 MB | Adobe PDF | Visualizar/Abrir |
Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.