dc.descriptionEl campo Parahuacu tiene 23 pozos perforados en 40 años de producción y una rata promedia actual de 3200 BPPD. Tiene un acumulado de petróleo de aproximadamente 26MMBls, lo que representa un 4,6% de factor de recobro. Esto representa una baja producción y hace necesario elaborar un plan de desarrollo que permita maximizar los recursos y además que sea rentable en el tiempo. Para realizar el plan primero se necesitó interpretar los registros y obtener las propiedades petrofísicas, junto con la verificación de PVT y presiones, para conocer el campo y poder calcular tanto POES como reservas. Con base en los resultados obtenidos se elaboró un plan de perforación y reacondicionamiento. El plan de perforación consiste en perforar nuevos pozos. Con base en los registros y correlaciones se propusieron pozos y mediante pozos tipos se determinó las reservas de los pozos propuestos. Mientras, el plan de reacondicionamiento contempla principalmente cambios de zona debido a la baja permeabilidad de las arenas. Por último, para determinar que el plan sea rentable se hizo un análisis económico y poder verificar la viabilidad y factibilidad del proyecto con ayuda del VAN y TIR. Resultando estos positivos y dando visto bueno para llevarse a cabo.es_ES
dc.description.abstractParahuacu Field has 23 drilled wells in 40 years of production and a current average rate of 3200 STBD. The field has 26MMBls of cumulative oil, which represents a recovery factor of 4,6%. It shows a very low production, so it is necessary to make a development plan to maximize resources and make the field profitable over time. To carry out the plan, it was necessary to interpret the well logs and get the petrophysical properties, along with the verification of PVT and pressure analysis, to know the field and be able to calculate the OOIP and reserves. Based on the obtained results a perforation and workover plan were developed. The perforation plan consists on drilling wells. Based on well logs and correlations, wells were proposed and through type wells, the reserves of the new wells were calculated. On the other side, the workover plan mainly includes change of zone due to low permeability of sandstones. Finally, to determine that plan is profitable, an economic analysis was made to verify the viability of the project using IRR and NPV. The results were positives and the project should be carried out.es_ES
dc.description.sponsorshipCerón López, Gonzalo Mauricio, directores_ES
dc.language.isospaes_ES
dc.publisherUsiña Ortega, D. A. (2018). Plan de Desarrollo del Campo Parahuacu. 116 hojas. Quito : EPN.es_ES
dc.rightsopenAccesses_ES
dc.subjectYACIMIENTOS PETROLEROSes_ES
dc.subjectPOZOS PETROLEROSes_ES
dc.titlePlan de Desarrollo del Campo Parahuacues_ES
dc.typebachelorThesises_ES
Aparece en las colecciones:Tesis Ingeniería en Petróleos (IPET)

Ficheros en este ítem:
Fichero Descripción TamañoFormato 
CD-8824.pdf5,12 MBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.